
Most SharePoint migrations lose permissions, metadata, and site structure nobody warned you about. Iron Cove audits what actually breaks before it breaks — then migrates your content into Google Workspace with a validated, one-shot cutover.
Trusted by Warner Bros





These are the four issues that turn a routine SharePoint to Google Workspace migration into a support fire drill — and the reason we audit them before we touch a single file.
Once the migration engine runs its sync, there's no built-in path to go back and pull in what changed on the old system. We validate everything in a test pass before your team loses that safety net.
Folder and file permissions usually move. Owner and Membership roles on Microsoft 365 Group sites, tenant-level access, and shared links with special characters in the file name typically do not.
Managed metadata, lookup columns, retention labels, and anything referencing data outside the document library have no native home in Google Workspace and need a rebuild plan, not a copy job.
Site collections, custom site pages, forms libraries, custom lists, site logos and branding, and the newsfeed are SharePoint-specific. They need to be rebuilt intentionally, not assumed to transfer.
A six-phase process built around one rule: validate before you cut over, since most migration engines only sync one way.
Inventory site collections, document libraries, permission structures, and DNS records (MX, SPF, DKIM, DMARC) before anything moves.
Run a test pass into Google Workspace and check data integrity, permissions, and structure before committing to a cutover date.
Migrate document libraries, shared drives, and folder-level permissions, and flag anything site-specific that needs manual rebuilding.
Coordinate DNS and routing changes, then monitor mail and file access after cutover to confirm nothing is broken for end users.
Confirm every user can access their migrated content, resolve any post-cutover issues, and deliver a closeout summary.
We tell clients this before the project starts, not after cutover. If any of these are business-critical, we scope a rebuild plan alongside the migration.
We've run migrations off Microsoft environments since 2010 as a Google Cloud Partner — including the permission and metadata cleanup work most vendors skip.
Over a decade migrating organizations onto Google Workspace, alongside Microsoft Silver Partner and Okta Premier Partner status.
We validate data integrity in a test migration before scheduling cutover, since most sync engines can't be run in reverse.
We coordinate MX, SPF, DKIM, and DMARC changes directly with your DNS administrator and monitor mail flow after cutover.
We'll audit your site collections, permissions, and metadata before you commit to a cutover date — so nothing breaks that you didn't already know about.
© 2026 | Iron Cove Solutions| Privacy | Simplifying Cloud-Based Intention